Past Projects

Project Type: Water Treatment | Location: Ottawa, Ontario
The work at Lemieux Island consists of expansion to the existing 12 cell filter gallery plus significant retrofit to the existing facility involving numerous tie-ins and shut downs. The scope includes; six new filter cells and gallery extension over the existing south reservoir, extensive concrete... Read More
Project Type: Water Treatment | Location: Richmond, British Columbia
Construction of the Lulu Island WWTP for Greater Vancouver Regional District consisted of a new circular secondary clarifier, trickle filter, odour control facilities, a new electrical annex, new solids contact tank, blower relocations, site-works, underground utilities and electrical distribution... Read More
Project Type: Water Treatment | Location: Port Hope, Ontario
This expansion and retrofit to the existing complex consisted of a new headworks facility, two new aerobic digesters, three new aeration tanks, six new chain & flight secondary clarifiers, two chlorine contact tanks, a new sludge dewatering facility with centrifuge and associated equipment, new... Read More
Project Type: Water Treatment | Location: Oakville, Ontario
The Burloak WPP construction consisted of 13,000 m3 of cast in place concrete including a low lift pumping station, flocculation tanks, membrane filter tanks, multi-celled contactor tanks and a clearwell reservoir as well as traveling screens, low lift pumping equipment, Zenon Ultra-filtration... Read More
Project Type: Water Treatment | Location: Mississauga, Ontario
Expansion to the existing plant included the addition of a 250 MLD Zenon Ultrafiltration and Fuji Ozone Disinfection facility consisting of 55,000 m3 of rock and earthwork excavation and 14,000 m3 of new concrete. Also housed within the new facility are five BAC contactors complete with stainless... Read More
Project Type: Water Treatment | Location: Vancouver, British Columbia
The Seymour-Capilano Water Treatment Facility is one of the world's largest UV disinfection facilities. It can filter 2 billion litres of water per day, and supplies 75 percent of Greater Vancouver’s clean, pure, drinking water. Construction of the complex spanned 3 years commencing with forming... Read More
Project Type: Water Treatment | Location: Mississauga, Ontario
Expansion and retrofit of the Lakeview Wastewater Treatment Plant including; addition of two new travelling bridge type primary clarifiers, six new fine bubble diffuser aeration tank processes, eight new longitudinal type secondary clarifiers, sequenced removals and modifications to each of... Read More
Project Type: Water Treatment | Location: Sault Ste. Marie, Ontario
Major retrofit and expansion to the existing East End Water Pollution Control Plant including the sequenced mass demolition of one primary and four secondary circular clarifiers, the existing administration building and two detritor buildings, chlorine contact tanks, blower building, inlet works... Read More
Project Type: Water Treatment | Location: Pembroke, Ontario
Major expansion and retrofit to the existing Pembroke Water Pollution Control Plant consisting of a new SBR facility, new administration building, new UV disinfection facility, new digester and retrofit of existing digesters including expansion to the existing digester control building, new odour... Read More
Project Type: Water Treatment | Location: Uxbridge, Ontario
Expansion and retrofit to the Uxbridge Brook Water Pollution Control Plant consisting of new longitudinal clarifiers, new aerobic digesters and associated equipment, new tertiary filter facility, headworks sequenced demolition and expansion including new grit removal equipment and chemical systems... Read More