Yellowknife Water Treatment Plant

Project Type: 
Water Treatment
Project Owner: 
City of Yellowknife
Project Consultant: 
AECOM Canada Ltd.
Project Value: 
$30,000,000
Project Years: 
2013-2015

A new water treatment plant building located adjacent to and on top of an existing treated water storage reservoir. Scope of work consists of removal of existing equipment inside pumphouse 1, to include associted items such as supports, housekeeping pads, electrical/controls cabling, panels etc.

Supply and installation of new river raw water pumps and river raw water tanks in pumphouse 1, plus associated ancillary equipment, Supply and install distribution pumps, fire pumps, recirculation pumps and backwash in the new water treatment building.

Capping and removal of pipe in existing treated water reservoir pump wells to facilitate the installation of the new equipment, replace all access ladders into all three reservoir cells was is required.

Supply and install, fluoridation dosing system, residuals handling system, comprising of residuals handling system, valves, pipes and pumps, standby electrical generators, associated HVAC mechanical, electrical, civil, structural, architectural, instrumentation and control equipment supply. Testing and commissioning of the individual systems and the complete process.