Past Projects

Aerial overview of jobsite with NAC team standing between two large cranes
Project Type: Water Treatment | Location: Winnipeg, Manitoba
Contract #4 for the Winnipeg South End Water Pollution Control Center (SEWPCC) involves expanding and upgrading the facility to meet the operating and effluent limits outlined in Environment Act License 2716RR dated April 18, 2012, as well as accommodating year 2031 forecasted influent flows and... Read More
Aerial Overview of construction for Nanaimo Wastewater Treatment Plant
Project Type: Water Treatment | Location: Nanaimo, British Columbia
The Greater Nanaimo Pollution Control Center project consists of an expansion and upgrades to the existing wastewater treatment plant in general, and specifically new wastewater process structures including screening building, bioreactors, secondary clarifiers, aeration and thickening building, RAS... Read More
 Crane and Bucket Concreting for Bioreactors and Blower Building slab
Project Type: Water Treatment | Location: Winnipeg, Manitoba
The Winnipeg South Wastewater Treatment Plant Phase IV Expansion includes the construction of the following scope of work: • Construction of three Bioreactors and one Blower Building concrete structures • Construction of two Secondary Clarifier concrete structures • Supply and Installation of... Read More
Aerial overview of Greenway Water Pollution Control Plant
Project Type: Water Treatment | Location: London, Ontario
The Greenway WPCP Project is a major expansion to a live plant involving multiple stages and phases which are required to maintain the ongoing functionality of the facility. Below is a listing of the various activities which will occur during the construction of the expansion to this facility: •... Read More
Aerial Overview of Orangeville Water Pollution Control Plant with NAC group out front
Project Type: Water Treatment | Location: Orangeville, Ontario
The Orangeville Water Pollution Control Plant Expansion and upgrades includes: a new detritor rake mechanism; additional bioreactor; new mechanical mixers in the first aerobic zone of bioreactor No.’s 4 and 5; replacement of all existing mixed liquor return pumps (new and old plants); replacement... Read More
Aerial overview of Integrated Grain Processors Cooperative Ethanol Plant
Project Type: Ethanol | Location: Aylmer, Ontario
The Integrated Grain Processors Cooperative (IGPC) Ethanol Plant in Alymer, ON was delivered under a design-build contract using ICM ethanol technology. The finished plant is capable of producing 40 million USG of denatured ethanol per year . The overall construction and commissioning of this plant... Read More
Downstream Timiskaming Ontario Dam
Project Type: Heavy Civil & Infrastructure | Location: Thorne, Ontario
The Timiskaming Dam Complex is located approximately 65km northeast of North Bay Ontario, on the border between Quebec and Ontario. The work included the construction of a temporary downstream cofferdam; complete replacement of a 120m wide flow control dam on the Ottawa River; installation of new... Read More
Britannia Pumping Station
Project Type: Water Treatment | Location: Boyne, Ontario
The Britannia Pumping Station involves the construction of a new 1000 L/s wastewater pumping station including overflow discharge to the Sixteen Mile Creek and installation of a 450mm forcemain on the existing Britannia Road Sixteen Mile Creek bridge crossing, with two stubs for future 450mm... Read More
Aerial overview Point Pleasant Water Treatment Plant
Project Type: Water Treatment | Location: Kingston, Ontario
Construction of a new Filter Building that includes; New raw water feed channel, 3 new rapid mix tanks and mixers, 10 new flocculation tanks with mixers, backwash waste conduit, flocculated water conduit, 5 new dual medial filters, and associated piping, 2 new clearwells, 2 new blowers and... Read More
Project Type: Water Treatment | Location: Yellowknife, Northwest Territories
A new water treatment plant building located adjacent to and on top of an existing treated water storage reservoir. Scope of work consists of removal of existing equipment inside pumphouse 1, to include associted items such as supports, housekeeping pads, electrical/controls cabling, panels etc... Read More

Pages