276 - Bearspaw Operations

Bearspaw Operations Workplace Centre Calcium Chloride Tank Replacement

The Bearspaw Operations Workplace Centre Calcium Chloride Tank Replacement consisted of the installation of a storage tank and dosing system for calcium chloride including concrete secondary containment walls and a base slab.

The project also involved:

  • The installation of a 51,000 liter chemical storage tank
  • Installation of access stairs and platform
  • Installation of a calcium chloride centrifugal pump and associated piping
  • A truck fill station
  • Associated electrical and instrumentation work including controls panels and system programming

Project Owner:

  • City of Calgary, AB

Project Consultant:

  • Stantec Engineering

Year of Completion:

2016