Orangeville Water Pollution Control Plant Expansion
The Orangeville Water Pollution Control Plant Expansion and upgrades included:
- A new detritor rake mechanism
- An additional bioreactor
- New mechanical mixers in the first aerobic zone of bioreactor No.’s 4 and 5
- Replacement of all existing mixed liquor return pumps (new and old plants)
- Replacement of existing blowers (new and old plants) with new blowers
- An additional square clarifier
- New scum hopper for clarifier No. 2 along with replacement of the scum pump and piping and addition of a second scum pump
- Replacement of mechanisms and control panels for clarifiers No. 1 and 2
- Removal and replacement of existing RAS and WAS pumps with four VFD controlled combined RAS/WAS pumps.
The project also included:
- A new electrical control building
- Replacing existing alum feed pumps with 6 new pumps and heat traced discharge piping; construct a new single media shallow bed, automatic backwash filter and building
- Demolishing existing digester building and contents
- Constructing a new boiler building with new boiler equipment dedicated solely to the digester
- Complete refurbishment of filter No. 1 components
- Sand media in filter No. 2 replacement
- New larger capacity VFD controlled pumps
- New centrate holding tank and pumping system
- New effluent wash water pumping system and new related underground piping
- New 650kW diesel generator
- New electrical substation and associated distribution equipment
- Replacement of various MCCs with new MCCs and various electrical upgrades
- Upgrades to ventilation systems and electrical equipment
- Various flood proofing improvements to the older structures in the plant
- Related mechanical process piping and control devices
- Yard piping ranging in pipe sizes from 50 to 900 mm dia.,
- Related shoring and dewatering systems
- Temporary traffic control lighting when work is on-going on Townline right of-way
- Continuous maintenance of regular flows.
Project Delivery Methods:
Project Sectors:
Project Services:
Project Owner:
- Town of Orangeville, ON
Project Consultant:
- R.J. Burnside & Associates
Year of Completion:
2018Related Projects
-
Tofino Wastewater Treatment Plant
Tofino,
British Columbia -
Arnprior Water Pollution Control Center Expansion
Arnprior,
Ontario -