184 - Lemieux Island WTP

Lemieux Island Water Purification Plant Filter Expansion

The work at Lemieux Island consisted of expanding the existing 12-cell filter gallery and significantly retrofitting the existing facility, which involved numerous tie-ins and shutdowns.

The scope included:

  • Six new filter cells and gallery extension over the existing south reservoir
  • Extensive concrete refurbishing and baffle installations within each reservoir
  • Sequenced retrofit to the existing floc tanks, including baffle installations
  • A new blower building, new flow metering chambers
  • New sections of CPP piping requiring multiple tie-ins completely redirecting process flow for the facility
  • Installation of new low-lift pumps, including refurbishment of existing pumps
  • Plus the complete sequenced overhaul of electrical distribution and PLC systems all while keeping the entire facility in continuous operation.

Project Owner:

  • City of Ottawa, ON

Project Consultant:

  • CH2M Hill Canada

Year of Completion:

2009