161 - Port Hope WTP Upgrades

Port Hope Water Treatment Plant Upgrades

Expansion of the existing Port Hope Water Treatment Plant and the addition of a new 20 MLD Zenon Ultrafiltration building.

The new addition consisted of the following elements:

  • Four Zenon membrane trains and associated pumps and ancillary equipment
  • High and low lift vertical turbine pumps and associated piping
  • Inlet screening
  • Emergency generator
  • Chemical equipment and systems
  • A new reservoir and chlorine contact tanks
  • Chlorine equipment and piping
  • Backwash wastewater treatment equipment and systems
  • New offices and control rooms
  • Extensive yard piping
  • Access roads and site related work.

Project Owner:

  • Regional Municipality of Port Hope

Project Consultant:

  • KMK Consultants

Year of Completion:

2005