The Winnipeg South Wastewater Treatment Plant Phase IV Expansion includes the construction of the following scope of work:
• Construction of three Bioreactors and one Blower Building concrete structures
• Construction of two Secondary Clarifier concrete structures
• Supply and Installation of precast concrete piles for the Bioreactors and Blower Building
• Supply and Installation of a 2100mm diameter concrete pipe and concrete chambers
• Supply and Installation of piping embeds
• Supply and Installation of concrete encased piping
• Supply and Installation of aluminum grating, aluminum handrails, aluminum checkered
• plate, aluminum stairs
• Excavation to facilitate the construction of the Bioreactor concrete structure
• Excavation to facilitate the construction of the Secondary Clarifiers concrete structures
• Excavation and backfilling to facilitate the construction of the 2100mm diameter CPP
• Removal of shoring to facilitate construction of the Bioreactors and Secondary Clarifiers
• Water leak testing and backfill of the Bioreactors and Secondary Clarifiers Structures
• Site dewatering and ground water depressurization
• Miscellaneous site maintenance