Lakeview WTP Contract 4

Pump Gallery
Overview of NAC group standing in front of large pipes
Pump Gallery
chemical systems
MCCs Electrical Room
Building front
Pump Gallery
Control Room
Ionization equipment with supply and return pipelines
Project Type: 
Water Treatment
Project Owner: 
Region of Peel
Project Consultant: 
CH2M Hill
Project Years: 
2005-2007

Expansion to the existing plant included the addition of a 250 MLD Zenon Ultrafiltration and Fuji Ozone Disinfection facility consisting of 55,000 m3 of rock and earthwork excavation and 14,000 m3 of new concrete.

Also housed within the new facility are five BAC contactors complete with stainless steel internals and media, various chemical systems and storage tanks, and air blowers. A new electrical substation including transformers and modifications to the existing feeder station allows increased power for expansion.

Also included are upgrades to the existing low lift pump station with the addition of three new low lift pumps and travelling screen. Yard work includes a new 1800 mm forcemain to connect the low lift pump station to the disinfection facility and a 1650 mm overflow pipe to Lake Ontario.