Port Hope

Pump Gallery
Foundation Excavation
vertical turbine pumps
Port Hope Water Treatment Plant Entrance
Project Type: 
Water Treatment
Project Owner: 
Municipality of Port Hope
Project Consultant: 
KMK Consultants Limited
Project Years: 
2003-2004

Expansion of the existing Port Hope Water Treatment Plant with a new 20 MLD Zenon Ultrafiltration building addition consisting of; four Zenon membrane trains and associated pumps and ancillary equipment, high and low lift vertical turbine pumps and associated piping, inlet screening, emergency generator, chemical equipment and systems, reservoir and chlorine contact tanks, chlorine equipment and piping, backwash wastewater treatment equipment and systems, new offices and control rooms, as well as extensive yard piping, access roads and site related work.