Arbutus Attenuation Tank
The Arbutus Attenuation Tank Project included a new access driveway, site drainage and facilities, sanitary sewers, watermains and an attached valve/meter chamber.
The project also included off-site works which consist of improvements to the road frontage on Arbutus Road.
The on-site components of the work are generally described as follows:
- Clearing, grubbing and preparation; water service
 - Tank valve chamber
 - Construction of sewers and tie-ins including bypass pumping
 - Removal of abandoned sewer infrastructure
 - Secant pile installation and shoring
 - Structure excavation
 - Rock blasting
 - Rock anchors
 - Reinforced concrete structure; process mechanical systems including piping, cleaning system, sump pumps and air compressor system
 - Building mechanical systems including heating, ventilation, plumbing and odour control system; electrical systems including power supply and distribution, motor control centre, variable frequency drives, lighting, and generator plug-in receptacle
 - Controls, instrumentation, programming and SCADA integration
 - Site grading and site drainage works
 - Landscaping
 - Access driveway and parking areas.
 
The off-site components of the work included:
- Arbutus Road frontage improvements
 - Existing asphalt removal
 - Earthwork grading
 - Subgrade preparation
 - Asphalt roadway and line painting
 - Asphalt bicycle lane and line painting
 - Concrete sidewalk, curb and gutter; storm water infrastructure
 - Infiltration swales
 - Bus stop and signage.
 
Project Delivery Methods:
Project Sectors:
Project Services:
Project Owner:
- Capital Region District
 
Project Consultant:
- Kerr Wood Leidal
 
Year of Completion:
2021
    Related Projects
- 
                    
    
    Denis St. Pierre Water Pollution Control Plant Expansion
Lakeshore,
Ontario - 
                    
    
    Tofino Wastewater Treatment Plant
Tofino,
British Columbia - 
                    
    Arnprior Water Pollution Control Center Expansion
Arnprior,
Ontario