The Arbutus Attenuation Tank Project included a new access driveway, site drainage and facilities, sanitary sewers, watermains and an attached valve/meter chamber.
The project also included off-site works which consist of improvements to the road frontage on Arbutus Road.
The on-site components of the work are generally described as follows:
- Clearing, grubbing and preparation; water service
- Tank valve chamber
- Construction of sewers and tie-ins including bypass pumping
- Removal of abandoned sewer infrastructure
- Secant pile installation and shoring
- Structure excavation
- Rock blasting
- Rock anchors
- Reinforced concrete structure; process mechanical systems including piping, cleaning system, sump pumps and air compressor system
- Building mechanical systems including heating, ventilation, plumbing and odour control system; electrical systems including power supply and distribution, motor control centre, variable frequency drives, lighting, and generator plug-in receptacle
- Controls, instrumentation, programming and SCADA integration
- Site grading and site drainage works
- Landscaping
- Access driveway and parking areas.
The off-site components of the work included:
- Arbutus Road frontage improvements
- Existing asphalt removal
- Earthwork grading
- Subgrade preparation
- Asphalt roadway and line painting
- Asphalt bicycle lane and line painting
- Concrete sidewalk, curb and gutter; storm water infrastructure
- Infiltration swales
- Bus stop and signage.
Project Delivery Methods:
Project Sectors:
Project Services:
Project Owner:
- Capital Region District
Project Consultant:
- Kerr Wood Leidal
Year of Completion:
2021Related Projects
-
Tofino Wastewater Treatment Plant
Tofino,
British Columbia -
Arnprior Water Pollution Control Center Expansion
Arnprior,
Ontario -