Winnipeg South Wastewater Treatment Plant Expansion Phase IV
The Winnipeg South Wastewater Treatment Plant Phase IV Expansion includes the construction of the following scope of work:
- Construction of three Bioreactors and one Blower Building concrete structures
- Construction of two Secondary Clarifier concrete structures
- Supply and Installation of precast concrete piles for the Bioreactors and Blower Building
- Supply and Installation of a 2100mm diameter concrete pipe and concrete chambers
- Supply and Installation of piping embeds
- Supply and Installation of concrete encased piping
- Supply and Installation of aluminum grating, aluminum handrails, aluminum checkered
- Plate, aluminum stairs
- Excavation to facilitate the construction of the Bioreactor concrete structure
- Excavation to facilitate the construction of the Secondary Clarifiers concrete structures
- Excavation and backfilling to facilitate the construction of the 2100mm diameter CPP
- Removal of shoring to facilitate construction of the Bioreactors and Secondary Clarifiers
- Water leak testing and backfill of the Bioreactors and Secondary Clarifiers Structures
- Site dewatering and ground water depressurization
- Miscellaneous site maintenance
Project Delivery Methods:
Project Sectors:
Project Services:
Project Owner:
- City of Winnipeg
Project Consultant:
- CH2M Hill Canada
Year of Completion:
2017Related Projects
-
Tofino Wastewater Treatment Plant
Tofino,
British Columbia -
Arnprior Water Pollution Control Center Expansion
Arnprior,
Ontario -